well get your concrete
 
 
SYSTEMS FOR FORMWORK AND FALSEWORK
 
Home | About Us | Addresses | News | Contact Us | Downloads | F.A.Q. | Links | Products | Projects | QAQC | References | Site Map
alpi sea formwork experts English Language ภาษาไทย Langue Française

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

ALPI SEA rule
PROJECTS
0

ABU DHABI STRATEGIC TUNNEL ENHANCEMENT PROGRAMME LINK SEWER CONTRACT LS-01 Project
Clients: Ed. Züblin AG Abu Dhabi & Commodore Cement Industries L.L.C.

 

Drawing for Mould for Jacking Pipe
Zublin Abhudhabi

The contract is part of the Strategic Tunnel Enhancement Programme (STEP) by the Abu Dhabi Sewerage Services Company (ADSSC). The programme is in direct response to aggressive growth set forth in recent years and consists of a 40-kilometer long deep wastewater tunnel with a pumping station at its end and a network of link sewers connecting the existing sewage network and pumping stations to the wastewater tunnel. The new wastewater network will discharge the complete sewage of the city of Abu Dhabi with an approx population of 1,000,000 people.

As part of the STEP Programme Ed. Züblin AG Abu Dhabi & Commodore Cement Industries LLC have received the contract award for Link Sewer Contract LS-01 Package. Contract LS-01 is located at Abu Dhabi Island (CBD) and consists of the construction of 35.7 KM Sewerage Network with diameters ranging from 200 mm to 2800 mm and 247 shafts for manholes with a depth between 8 m to 26 m.

Pipe Jacking Method will be implemented for the construction of the sewer tunnels, and in one hand, Züblin AG chose alpi sea to supply all the Moulds for Jacking Pipes (ID700 / 800 / 1000 / 1200 / 1500 / 1800 / 2800 / 3100) with lubrication and accessories.

In the second stage, alpi sea supplied Commodore Cement Industries LLC Precast Concrete Standard Shafts / Cutting Shoe Segment Moulds ID3000 / 3900 / 5000 / 6000 with “Vertical method of casting”.  

This contract total value is around 1,5M€.