0

THE SHERATON PARK Project (SPP) DOHA, QATAR
Client: Qatari Diar & Vinci Construction Grands Projets (QDVC)

sppview

cojaal

The Sheraton Park project includes a two-level car lot and an underground tunnel providing access to the under-construction Convention Centre across the road.

cojaal algeria
/!\ MORE INFORMATION COMING SOON /!\

Work on the Sheraton Park project, an ambitious plan which will change the face of Doha’s Corniche.
The project, with focus on developing the Sheraton-end of the over 8km Corniche into a public park, includes a two-level car lot and an underground tunnel providing access to the under-construction Convention Centre across the road. The proposal also includes the design-build of a maintenance-depot and a control centre for Doha’s future light-rail passenger transit system and two connecting entry-and-exit tunnels.

QDVC is a subsidiary of Vinci Construction Grands Projects (49%), and Qatari Diar (51%).

The contract calls for the design-build of a 66kV sub-station for the utility provider, Kahramaa, in addition to two 11kV sub-stations. According to information posted on Vinci Construction’s website, the project consists of a 73,000m2 public park of “exceptional quality”, including basins, water fountains, children’s playgrounds, cafes and restaurants.

Certain parts of the car-park building are air-conditioned. It will have a dozen lifts as well as a freight lift. An electronic guiding system will direct users to available parking spots. The agreement with QDVC is an ECI (early contractor involvement) contract, which enables the company to involve in the design and study phase (phase 1) and in which construction costs (phase 2) are then jointly determined by the client and the company. Phase 1 covers preliminary activities such as repositioning the Sheraton Hotel’s network and re-alignment of the Corniche Road, in addition to developing studies and evaluating project pricing.

View of one of our Fabrication Progress for this project (Column C5 & C6).


Columns C5 & C6