well get your concrete
 
 
SYSTEMS FOR FORMWORK AND FALSEWORK
 
Home | About Us | Addresses | News | Contact Us | Downloads | F.A.Q. | Links | Products | Projects | QAQC | References | Site Map
alpi sea formwork experts English Language ภาษาไทย Langue Française

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

ALPI SEA rule
PROJECTS
0

SOUTHERN OUTER BANGKOK RING ROAD PROJECT – THAILAND
Client: Vichitbhan Group / Krungthong Eng

vitgroup

SOBRR Bangkok
The missing link.

After building a 130 km U-shaped ring road around the east, north and west of Bangkok, the missing southern link was a stretch of 34 km over the low lying delta of the Chao Phraya River. The link, known as the Southern Outer Bangkok Ring Road Project, is build almost entirely as an elevated express way including a cable-stayed 6 lane bridge with a total length of over 900 meter. alpi sea was proud to be associated with this project by being their exclusive supplier of formwork and falsework systems.
sobrr bangkok